JHARSUGUDA CPP (9x135MW)
Large-Scale Captive Power Plant in India. Delivered Electric Actuators (AVA/AVAT series) using 131 Units for Vedanta Group Company / SEPCOIII Electric Power Construction Corporation.


Why This Project Matters
The JHARSUGUDA project is a giant power complex featuring nine 135MW units. GREATORK's supply of 131 units highlights our capacity to manage complex, large-scale simultaneous deployments across multiple power generation blocks.
Being selected by SEPCOIII for their critical Indian projects proves that GREATORK is a Tier-1 actuator supplier capable of meeting the rigorous quality, documentation, and international standard requirements of world-class engineering firms.
As a Captive Power Plant (CPP) supporting one of the world's largest aluminum smelters (Vedanta), the reliability of GREATORK actuators is essential for ensuring an uninterrupted power supply to critical industrial production lines.
Technical Solutions Deployed
Utilizing absolute encoders with 0.5% measurement accuracy, our actuators ensure precise valve control in the plant's steam and water cycles, even in the intense heat characteristic of Indian industrial zones.
The infrared setting technology allows engineers to perform commissioning without opening the electrical cover, protecting the sensitive electronic control units from the pervasive coal dust and fly ash found in thermal plants.
Features built-in motor overheating, phase loss, and overcurrent protection, which are vital for maintaining equipment integrity in regions where power grid fluctuations are common.

Have a similar project requirement?
Our engineering team is ready to provide tailored actuation solutions.
Contact for Similar Project